The project was an installation of a new Air Handler Unit (AHU) to serve the ground floor OR Suite.  AHU 10 was installed in a new 2,000 square foot mechanical penthouse located on the first-floor roof.  Existing ductwork, piping, electrical and control systems were extended to the new AHU from existing systems to create capacity for future growth.  This design allowed the AHU to be installed while all existing systems remained in operation and scheduled shutdowns and connections were performed for zero interruptions for the hospital.